India's renewable energy sector is creating opportunities across power generation, infrastructure, manufacturing and corporate energy procurement. Wind power remains an important part of this transition, particularly in regions with suitable wind resources and access to transmission infrastructure.
A recent social-media video explains the financial structure of a 1 MW windmill project and highlights the potential tax benefit associated with depreciation. It presents an illustrative project cost of ₹8 crore, first-year depreciation of ₹3.20 crore and a potential tax reduction of approximately ₹80.5 lakh.
These figures raise an important question: how does windmill depreciation work, and what should businesses examine before evaluating such a project?
The answer requires more than a simple calculation. Project cost, asset classification, tax eligibility, electricity generation, power-sale arrangements and operating expenses all influence the final financial outcome.
1. Understanding a 1 MW Wind Power Project
A 1 MW wind turbine is designed to convert the kinetic energy of wind into electrical energy. Its actual electricity output depends on wind speed, turbine design, hub height, site conditions, availability and grid-related constraints.
A wind power project is not limited to the turbine itself. The overall project may include:
Wind turbine generator and associated equipment
Tower, foundation and civil works
Land and site-development expenses
Transportation, erection and commissioning
Electrical infrastructure and transformers
Transmission and power-evacuation arrangements
Project-development and financing costs
Consequently, the final project cost can differ considerably between locations and developers.
The video uses ₹8 crore as an illustrative all-in cost for a 1 MW windmill. This should not be interpreted as a fixed market price. In September 2026, a report on CTUIL's revised benchmarks stated a wind-project benchmark cost of ₹6 crore per MW for financial-closure and land-compliance assessment. That benchmark serves a regulatory-administrative purpose and is not necessarily the final turnkey price payable by every project developer.
A proper cost assessment should therefore use a detailed project report, supplier quotations, land documentation, grid-connectivity estimates and financing assumptions.
2. How Wind Power Generates Revenue
A windmill generates electricity when wind turns its rotor blades, driving a generator. The electricity can then be supplied through an approved grid connection or used under an eligible captive or third-party arrangement.
The project's revenue depends on several factors:
Electricity generation: A turbine's 1 MW nameplate capacity does not mean that it continuously generates 1 MW throughout the year.
Capacity Utilisation Factor: CUF measures actual electricity generation against the maximum possible generation at full rated capacity throughout the relevant period.
Power-sale arrangement: Revenue may depend on a power purchase agreement, competitive bidding, a distribution utility arrangement, captive consumption or an eligible open-access transaction.
Grid availability: Transmission constraints, curtailment, evacuation delays and payment arrangements can affect the amount of electricity that is ultimately sold or used.
The Central Electricity Regulatory Commission's Renewable Energy Tariff Regulations, 2024 specify wind-project CUF norms ranging from 22% to 35%, depending on annual mean wind power density. The regulations also require wind sites to be classified using wind-resource assessment and validation procedures.
These figures are regulatory norms for tariff-related purposes, not a guarantee that every individual turbine will achieve the same annual generation.
3. What Is Levelized Cost of Energy (LCOE)?
The video refers to an LCOE range of approximately ₹2.5–₹3.5 per unit of electricity.
LCOE, or Levelized Cost of Energy, is a financial measure used to estimate the average lifetime cost of generating one unit of electricity. It considers factors such as:
Initial project capital expenditure
Financing and cost of capital
Operations and maintenance
Expected electricity generation
Project life
Applicable taxes and other assumptions
LCOE should not be confused with the tariff at which electricity is actually sold. A project's commercial revenue depends on its contractual or approved power-sale price, the quantity of electricity delivered and the terms governing payment.
CERC's 2024 regulations provide for project-specific tariff determination for wind projects. They also recognise the importance of capital cost, operating expenses, depreciation, return on equity and working-capital requirements in tariff calculations.
Accordingly, the LCOE range shown in the video should be treated as an illustrative estimate, not as a guaranteed generation cost or assured electricity-sale price for every Indian wind project.
4. The 40% Depreciation Benefit for Eligible Windmills
One of the most important financial aspects discussed in the video is depreciation.
Depreciation recognises the reduction in the accounting or tax value of an asset over time. For income-tax purposes, eligible assets are generally grouped into blocks, and depreciation is calculated using the prescribed rate and written-down value method.
The Income-tax Department's 2026 depreciation table provides a 40% depreciation rate for specified renewable-energy devices, including windmills and specially designed devices running on wind energy, installed on or after 1 April 2014.
This provision is important, but it should not be interpreted as an automatic 40% deduction on every rupee spent on a wind power project. The applicable asset classification, installation date, use of the asset and other tax conditions must be checked.
Illustrative first-year calculation
Assume the following figures from the video:
| Particular | Illustrative amount |
|---|---|
| Project asset cost assumed eligible for depreciation | ₹8.00 crore |
| Depreciation rate | 40% WDV |
| First-year depreciation | ₹3.20 crore |
| Illustrative effective corporate tax rate | 25.17% |
| Potential tax reduction | Approximately ₹80.5 lakh |
The calculation is:
₹8 crore × 40% = ₹3.20 crore depreciation.
₹3.20 crore × 25.17% = approximately ₹80.54 lakh.
This is a mathematical illustration. It does not establish that every project owner can claim the entire amount or realise the full tax reduction in the same year.
5. Understanding the Written-Down Value Method
Under the written-down value method, depreciation in later years is calculated on the remaining tax value of the asset block, rather than repeatedly applying the rate to the original cost.
Using the video's assumptions:
| Financial year | Opening written-down value | Depreciation at 40% | Closing written-down value |
|---|---|---|---|
| Year 1 | ₹8.00 crore | ₹3.20 crore | ₹4.80 crore |
| Year 2 | ₹4.80 crore | ₹1.92 crore | ₹2.88 crore |
| Year 3 | ₹2.88 crore | ₹1.152 crore | ₹1.728 crore |
The cumulative depreciation is ₹6.272 crore after three years.
This equals 78.4% of the original ₹8 crore amount.
The video therefore uses a mathematically consistent WDV illustration. However, the actual tax depreciation schedule may differ depending on the asset block, eligible cost, date the asset is put to use, applicable tax regime and other statutory provisions.
6. Why the ₹80.5 Lakh Tax Saving Is Not Guaranteed
The first-year tax-saving figure is calculated by multiplying the illustrative depreciation amount by an assumed effective tax rate.
That does not mean the tax department pays ₹80.5 lakh to the project owner.
Depreciation generally reduces taxable business income. The actual tax benefit depends on whether the taxpayer has taxable income against which the depreciation allowance can be used and whether the relevant tax provisions permit the claim.
For example, a company with insufficient taxable profits may not obtain the same immediate tax reduction as a profitable company. The treatment of unabsorbed depreciation and its future use must be examined under the applicable law.
The 25.17% figure is associated with the concessional corporate-tax regime under Section 115BAA of the Income-tax Act, 1961, and its corresponding provisions under the tax framework applicable from April 2026. Eligibility is subject to prescribed conditions, including restrictions on specified deductions and incentives.
The correct tax calculation must therefore establish:
Whether the taxpayer qualifies for the assumed corporate-tax regime.
Whether the windmill and related assets fall within the eligible depreciation category.
Which components of project expenditure qualify for the relevant rate.
Whether the asset has been installed and put to use in the relevant tax year.
Whether the taxpayer has sufficient taxable income to use the allowance.
Whether any subsidy, grant or other project support affects the tax or tariff calculation.
A tax illustration should never be presented as a guaranteed cash return.
7. Project Cost, Generation and the Importance of Site Selection
A windmill's financial performance is closely connected to the quality of its location.
Two projects with identical turbine capacity can produce different annual electricity output because of differences in wind speed, wind consistency, terrain, turbine specifications and grid infrastructure.
Before evaluating a project, developers generally need to examine:
Wind-resource assessment and site suitability
Land title, access and permitted land use
Turbine model and technical specifications
Foundation and civil-engineering requirements
Grid connectivity and evacuation capacity
Power purchase or captive-consumption arrangements
Expected annual generation and CUF
Operations, maintenance and insurance expenses
The CERC regulations provide for project-specific capital costs and project-specific tariff determination for wind projects. They also specify wind-resource-based CUF norms. This reinforces why a single cost or revenue estimate cannot be applied uniformly across every location.
8. Financial Risks That Should Be Included in the Business Model
Depreciation can improve the tax profile of an eligible project, but it does not remove the underlying commercial risks.
Capital expenditure overruns: Land, transport, foundation, equipment and grid-evacuation costs may differ from the initial estimate.
Generation uncertainty: Actual output can be lower than the projected generation used in the financial model.
Power-sale risk: The project needs a commercially viable and legally valid arrangement for selling or using electricity.
Grid and transmission constraints: Delays in connectivity or restrictions on evacuation can affect revenue.
Operating and maintenance costs: Equipment inspection, repairs, spare parts, insurance and maintenance contracts need to be budgeted over the project's life.
Financing costs: Interest rates, repayment schedules, debt-service obligations and working capital can materially affect project returns.
Tax uncertainty: A change in tax status, incorrect asset classification or insufficient taxable income may change the expected tax benefit.
A complete financial model should include all these factors rather than relying only on the depreciation calculation.
9. Wind Power's Long-Term Project Life
CERC's Renewable Energy Tariff Regulations, 2024 specify a useful life of 25 years for wind power projects for the purpose of the regulations.
A 25-year project horizon makes long-term planning important. Developers need to consider equipment performance, maintenance schedules, possible component replacement, insurance, financing and the terms of electricity-sale arrangements.
The useful-life assumption is a regulatory modelling parameter; it is not a promise that every component will operate for 25 years without maintenance or replacement.
10. What Businesses Should Verify Before Evaluating a Windmill Project
A business considering renewable-energy infrastructure should evaluate the project from technical, financial, legal and tax perspectives.
A professional review should cover:
A detailed project cost and funding plan
Independent assessment of wind resources
Turbine specifications and supplier warranties
Land and site-development documentation
Grid connectivity and evacuation approvals
Power purchase agreement or captive-use structure
Generation, revenue and operating-cost projections
Tax depreciation eligibility and applicable corporate-tax regime
Cash-flow projections and sensitivity analysis
Compliance, insurance and ongoing reporting requirements
For businesses assessing the tax and financial structure of renewable-energy assets, tax optimization can be relevant as part of a broader review of lawful tax planning, asset classification and financial assumptions. The actual treatment must always be determined from the taxpayer's facts and applicable law.
Conclusion: Depreciation Is One Part of Windmill Project Economics
The 1 MW windmill example in the video offers a useful illustration of how depreciation can influence the financial profile of a renewable-energy project.
The figures of ₹8 crore project cost, ₹3.20 crore first-year depreciation and approximately ₹80.5 lakh potential tax reduction are mathematically consistent under the assumptions presented. The three-year cumulative WDV write-off of 78.4% also follows from applying a 40% depreciation rate to the declining balance.
However, these figures are not universal project economics or guaranteed tax outcomes. Eligibility, actual capital cost, asset classification, taxable income, tax regime, electricity generation and power-sale arrangements all require independent examination.
For businesses, the more reliable approach is to assess a wind power project through a complete financial model that combines technical feasibility, capital expenditure, operating performance, financing and tax compliance.
Renewable-energy infrastructure can contribute to India's energy transition, but sound investment decisions depend on verified data, realistic assumptions and careful due diligence.
Watch the Video and Follow Shunyatax Global
Original Instagram Reel:
https://www.instagram.com/reel/Df_j4VKvmZX/?bqrl=MXVzYW56OWdjY2l2eA==
Follow Shunyatax Global on Instagram:
https://www.instagram.com/shunyatax_global/
Follow Shunyatax Global for professional insights on taxation, finance, business, compliance and global developments.